The Natt McDougall Company has had extensive experience using alternative project delivery methods that include the Construction Manager/General Contractor (CM/GC) arrangement as a means of delivering a Project efficiently. When the CM/GC technique was first introduced in the late 80’s, it was within the building sector of construction that the method became known, and, in the State of Oregon particularly so. The traditional Design-Bid-Build approach, which was the norm for getting public projects built for most of the last century, was supplanted by the CM/GC method or variations of it as a reaction to excessive claims by Contractors who had no involvement in the design process. There was actually a significant mentality among contractor’s to fight CM/GC initially with the thinking that the firm with the fanciest proposal would win the job, regardless of ability.

Our experience with pumpstations includes the following projects:

Lower Tualatin Pump Station
75 MGD Transmission Conduit Phase II
Clackamas River Intake Modifications
Kingsley Field Indust Pumping Station
Willamette Water Treatment Plant
Fanno Basin Pump Station
Columbia Blvd Influent Pump Station
Pump Stations #1 & #4
Cozine Pump Station
Clackamas River Water Intake
Cold Springs Pumping Plant
Columbia River Pumping Plant
French Creek Pumping Plant
York Pumping Station

Pumpstations